An additional high pressure economizer was installed at Unit B1 of the 620 MWe lignite-fired Power Plant "Nikola Tesla B" after 30 years of its operation. An innovative connection of the new additional economizer was applied. It is in parallel connection to the first section of the originally built economizer and it is directly fed with the feedwater from the outlet of the feedwater pump. The analysis of Unit Bl operation with such an economizer arrangement is performed and it is supported by measured data. It is shown that more than 30 MWth of the flue gas waste heat is recovered. The Unit gross efficiency is increased by 0.53 percentage points, which leads to 9.4 MWe of the electric power production. The parallel connection of the additional economizer also leads to the partial feedwater bypass of the high pressure heaters, which enables an increase of the plant electric power by up to 24.5 MWe. The accompanying effects are the reduction of the pressure drop in the feedwater line and the economizers, which leads to the decrease of the energy consumption for the main feedwater pump operation. The applied solution is presented together with measured and calculated energy and economic benefits.
机译:运行了30年后,在620 MWe褐煤发电厂“ Nikola Tesla B”的B1单元安装了另一台高压省煤器。应用了新的省煤器的创新连接。它与最初建造的省煤器的第一部分并联,并从给水泵的出口直接供给给水。使用这种节能器装置进行单元B1操作的分析,并由测量数据来支持。结果表明,回收了超过30兆瓦的烟气余热。单位的总效率提高了0.53个百分点,这导致了9.4 MWe的电力生产。额外的省煤器的并联连接还导致高压加热器的部分给水旁路,从而使工厂的电力增加高达24.5 MWe。随之而来的效果是降低了给水管路和省煤器中的压降,从而降低了主给水泵运行的能耗。提出了所应用的解决方案以及测量和计算的能源和经济效益。

著录项

  • 来源
    《Energy》 |2014年第1期|907-918|共12页
  • 作者单位

    University of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade, Serbia;

    RAFAKO SA, 33 Lakowa Str., 47400 Raciborz, Poland;

    Rafako Engineering Solutions, Bulevar Arsenija Camojevica 86, 11070 Novi Beograd, Serbia;

    Thermal Power Plants 'Nikola Tesla', 11500 Obrenovac, Serbia;

    Thermal Power Plants 'Nikola Tesla', 11500 Obrenovac, Serbia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Waste heat; Flue gas; Economizer; Boiler;