首页> 外文期刊>Energy >Feasibility analysis of changing turbine load in power plants using continuous condenser pressure adjustment
【24h】

Feasibility analysis of changing turbine load in power plants using continuous condenser pressure adjustment

机译:使用连续冷凝器压力调节来改变发电厂涡轮负载的可行性分析

获取原文
获取原文并翻译 | 示例
           

摘要

A variety of power generation complementary can reduce the large power fluctuation in the electrical power system caused by large-scale new energy power connected into grid. The quick power generation such as hydropower, gas power, and fuel power are the most suitable complementary power. However, they are very short in China; meanwhile the coa1-fired power with slow rate of power change is dominant. Consequently, the coa1-fired power has to increase its load change range and speed so as to undertake the job of power complementation in the electric power system. This paper proposes a method to improve the load change capacity for the water cooled power plants through controlling the cooling water flow. Then the CCWCS (condenser cooling water control system) is put forward to execute this method on the premise of unit safety. CCWCS can also reduce the coal consumption in steady turbine load conditions. Based on the modeling of condenser, variable speed pump for the condenser cooling water and the characteristics of turbine power output to condenser pressure, the paper presents the relationship between the cooling water flow and turbine power output. Finally, a case study on a 600,000 kW unit proves the feasibility of our idea.
机译:多种发电互补可以减少因大规模新能源并网而在电力系统中造成的大功率波动。水力发电,天然气发电和燃料发电等快速发电是最合适的补充发电。但是,它们在中国很短。同时,功率变化率缓慢的coa1发电占主导地位。因此,使用coa1的电力必须增加其负载变化范围和速度,以承担电力系统中的电力补充工作。提出了一种通过控制冷却水流量来提高水冷电厂负荷变化能力的方法。然后提出了冷凝水冷却水控制系统CCWCS,在机组安全的前提下执行该方法。 CCWCS还可以在稳定的涡轮负载条件下减少煤炭消耗。在凝汽器,凝汽器冷却水变速泵的建模以及汽轮机功率输出对凝汽器压力的特性的基础上,提出了冷却水流量与汽轮机功率输出之间的关系。最后,以600,000 kW机组为例的研究证明了我们的想法的可行性。

著录项

  • 来源
    《Energy》 |2014年第1期|533-540|共8页
  • 作者单位

    State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, School of Control and Computer Engineering, North China Electric Power University, Beijing 102206, China;

    State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, School of Control and Computer Engineering, North China Electric Power University, Beijing 102206, China;

    State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, School of Control and Computer Engineering, North China Electric Power University, Beijing 102206, China;

    State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, School of Control and Computer Engineering, North China Electric Power University, Beijing 102206, China;

    State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, School of Control and Computer Engineering, North China Electric Power University, Beijing 102206, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Condenser pressure; Load change; Variable speed pump; Coa1-fired power plants; Coal consumption rate;

    机译:冷凝器压力负载变化;变速泵;Coa1电厂;煤炭消耗率;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号