The blackout that occurred in the northeastern U.S. and southeast ern Canada August 14, 2003 was but the tip of the iceberg of troubles facing the high voltage transmission grid in North America. The blackout highlights problems that are endemic across the continent, not just in a single region or utility jurisdiction. The fundamental problem is easy to see, easy to explain, and hard to fix. Years of regulatory uncertainty have produced a high voltage transmission system that has not received needed investment and maintenance and has not kept up with the needs of a rapidly commoditizing wholesale power market. Exactly the same overhang of deferred maintenance and deferred projects developed on the generation side of the market prior to 1997—almost no new generation projects were initiated over the prior decade, largely because of regulatory uncertainty. Once the rules for market governance were clearly in place, the prices became transparent and the traded market became liquid, a literal avalanche of generation construction projects ensued over the next six years.
机译:2003年8月14日在美国东北部和加拿大东南部发生的停电事故,不过只是北美高压输电网面临的麻烦的冰山一角。此次停电突显了整个非洲大陆普遍存在的问题,而不仅仅是单个地区或公用事业辖区。基本问题很容易看到,易于解释并且很难解决。多年的监管不确定性已经产生了高压输电系统,该系统尚未获得所需的投资和维护,也无法满足快速商品化批发市场的需求。在1997年之前,在发电侧开发的延期维护和延期项目的情况完全相同,在过去的十年中几乎没有新的发电项目启动,这在很大程度上是由于监管的不确定性。一旦明确制定了市场监管规则,价格就变得透明,交易市场变得具有流动性,在随后的六年中,随之而来的是发电建设项目的雪崩。

著录项

  • 来源
    《Energy》 |2004年第3期|p.4-8|共5页
  • 作者

    Kemm Farney;

  • 作者单位

    P&L Economics, P.O. Box 561, Newtown Square, PA 19073-0561;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 能源与动力工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号