Design assessment of a 5 MW fossil-fired supercritical CO_2 power cycle pilot loop

机译:5 MW化石燃料超临界CO_2功率循环先导回路的设计评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The concept of the supercritical CO2 (S-CO2) power cycle has been widely proved to be effective by several small scale test loops. However, more specific system layout for fossil-fired power generation and key components design assessment is still imperative to demonstrate the technology feasibility of commercial scale utility. The S-CO2 power cycle must be optimized to deal with fossil-fired system integration constraints. In the present study the technology adaption of S-CO2 power cycle for fossil-fired power plant has been evaluated in terms of both the whole thermodynamic cycle layout and the preliminary assessment of key components. The design considerations and selections of key parameters such as turbine inlet parameters, compressor inlet parameters and split flow ratios were analyzed by a self-developed code for the purpose of optimization design of a 5 MW fossil-based S-CO2 pilot test loop. The proposed recompression and reheat cycle with two split ratios tailored for fossil-fired power plants can achieve 33.49% net efficiency. As a first step to the final recompression cycle, the design of simple recuperated and reheat cycle after carefully considerations of the specific design assessment of core components such as boiler, turbines, compressor and compact heat exchangers has been accomplished and currently under construction. (C) 2019 Elsevier Ltd. All rights reserved.
机译:超临界CO2(S-CO2)功率循环的概念已通过几个小规模的测试回路得到了广泛证明。但是,仍然需要更具体的化石燃料发电系统布局和关键组件设计评估来证明商业规模公用事业的技术可行性。必须优化S-CO2的电源循环,以应对化石燃料系统的集成限制。在本研究中,已从整个热力循环布局和关键组件的初步评估两个方面评估了化石燃料发电厂的S-CO2功率循环技术适应性。通过自行开发的代码分析了设计考量和关键参数(例如涡轮机入口参数,压缩机入口参数和分流比)的选择,目的是优化基于5兆瓦矿物的S-CO2中试回路。拟议的针对化石火力发电厂的具有两个分流比的再压缩和再热循环可实现33.49%的净效率。作为最终再压缩循环的第一步,在认真考虑了核心组件(例如锅炉,涡轮机,压缩机和紧凑型热交换器)的具体设计评估之后,已经完成了简单的换热和再热循环的设计,目前正在建造中。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

  • 来源
    《Energy》 |2019年第1期|792-804|共13页
  • 作者单位

    Xian Thermal Power Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China;

    Xian Thermal Power Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China;

    Xian Thermal Power Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China;

    Xian Thermal Power Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China;

    Xian Thermal Power Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China;

    Xian Thermal Power Res Inst Co Ltd, Xian 710054, Shaanxi, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Supercritical CO2 power cycle; Pilot test loop; Boiler; Turbomachinery; Printed circuit heat exchanger;

    机译:超临界CO2功率循环;先导测试回路;锅炉;涡轮机械;印刷电路换热器;