...
首页> 外文期刊>Energy for sustainable development >Determining factor for the development of CDM biomass power projects
【24h】

Determining factor for the development of CDM biomass power projects

机译:CDM生物质发电项目发展的决定因素

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, a hypothesis that government's guarantee of power purchase rather than guarantee of carbon credit purchase determines the development of CDM biomass power projects in developing countries is tested by an empirical analysis using objective indicators and by an econometric analysis. The empirical analysis shows that there are indications that guarantee of power purchase rather than guarantee of access to sell carbon credits or guarantee of carbon credit purchase determines the development of a large percentage of registered CDM bagasse power projects in Brazil, India and Thailand. The result from the econometric analysis supports the hypothesis. The result also suggests that power purchase guarantee significantly determines whether or not there is development of a CDM biomass power project based on agricultural residues in a country. This suggests that implementing policies and regulations that guarantee an access for biomass power developers to sell electricity to the grid at an attractive price could lead to the development of biomass power projects in a larger number of developing countries.
机译:在本文中,通过客观指标的实证分析和计量经济学分析,检验了政府对电力购买的担保而非对碳信用额购买的担保决定了发展中国家CDM生物质发电项目发展的假设。实证分析表明,有迹象表明,购买电力的担保而不是获得出售碳信用额的担保或购买碳信用额的担保决定了巴西,印度和泰国大量已注册的CDM蔗渣发电项目的发展。计量经济学分析的结果支持该假设。该结果还表明,电力购买担保会极大地决定一个国家是否基于农业残留物开发CDM生物质能发电项目。这表明,执行确保生物质能开发商以优惠的价格向电网出售电力的政策和法规可能会导致大量发展中国家开发生物质能项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号