...
首页> 外文期刊>Energy sources >Local and imported coal-mix for coal-based power plants in Bangladesh
【24h】

Local and imported coal-mix for coal-based power plants in Bangladesh

机译:孟加拉国燃煤电厂的本地和进口煤混合物

获取原文
获取原文并翻译 | 示例

摘要

In the Power Sector Master Plan, a plan has outlined to generate 5,400 (19,200) MW electricity from coal-based power plants by 2021 (2030) to provide affordable electricity in Bangladesh using local coal together with imported coal. In the current context, policy makers depend on imported coal-based power plants instead of extraction of proven reserves from local coal mines. The paper performs a comparative analysis between local and imported coal in terms of different assessment criteria to search for an economically viable option for coal-fired power plants. Considering the constraints related to coal import, recent policy decision required further revision to set the strategy to use efficient local-imported coal-mix. In this regard, integrated strategy for electricity generation-mix, coal import strategy, and all-inclusive coal policy would be a decisive policy imperative that confronts the coal-mix dilemma with the efficient use of local and imported coal to meet ever-growing power demand.
机译:在《电力部门总体规划》中,计划概述了到2021年(2030年)从燃煤发电厂生产5,400兆瓦(19,200兆瓦)的电力,以便在孟加拉国使用当地煤炭和进口煤炭提供可负担的电力。在当前情况下,政策制定者依赖于进口的煤基发电厂,而不是从当地煤矿开采已探明的储量。本文根据不同的评估标准对本地和进口煤炭进行了比较分析,以寻找燃煤电厂的经济可行方案。考虑到与煤炭进口有关的制约因素,最近的政策决定需要进一步修订,以设定使用本地进口高效煤炭混合物的策略。在这方面,综合发电战略,煤炭进口战略和包容性煤炭政策将是一项决定性政策,当务之急是通过有效利用本地和进口煤炭来满足不断增长的电力,应对煤炭混合困境。需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号