首页> 外文期刊>The Energy Journal >Transition to Centralized Unit Commitment: An Econometric Analysis of Colombia's Experience
【24h】

Transition to Centralized Unit Commitment: An Econometric Analysis of Colombia's Experience

机译:向集中单位承诺的过渡:哥伦比亚经验的计量经济学分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper attempts to shed light on the relative merits of centralized electricity markets with multipart bids and dispatch using an MIP-based unit commitment optimization approach vs. self-committed markets with linear energy supply curves. We conduct an empirical study of data from the Colombian market, which in 2009 transitioned from a self-commitment paradigm to a centralized unit commitment approach where generators offer a linear supply function for energy along with start-up costs while the commitment and dispatch are determined by the system operator using MIP-based optimization. The results indicate that the transition to centralized dispatch has resulted in productive efficiency gains through a decrease in production costs. However, these gains have not translated into wholesale price decreases; in fact, wholesale prices increased after the change in the dispatch approach. These results suggest that productive efficiency gains have been captured by suppliers through the exercise of market power.
机译:本文试图通过使用基于MIP的单位承诺优化方法与具有线性能源供应曲线的自承市场,揭示具有多部分投标和集中投标的集中电力市场的相对优势。我们对来自哥伦比亚市场的数据进行了实证研究,该市场在2009年从自我承诺范式过渡到集中式单位承诺方法,在这种方法中,发电机在确定承诺和派遣额的同时,提供了能源以及启动成本的线性供应函数由系统操作员使用基于MIP的优化。结果表明,向集中调度的过渡通过降低生产成本而提高了生产效率。但是,这些收益并未转化为批发价格的下降;实际上,批发方式改变后,批发价格提高了。这些结果表明,供应商已经通过行使市场支配力获得了生产效率的提高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号