...
首页> 外文期刊>Energy Exploration & Exploitation >The segmental subsidence structure with immediate roof of gob side entry retaining in backfill mining
【24h】

The segmental subsidence structure with immediate roof of gob side entry retaining in backfill mining

机译:节段沉降结构,立即屋顶盖板侧进入回填采矿

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When gob side entry retaining is carried out in backfill mining, the roof will show different subsidence morphology due to the difference of compactness and supporting force of the backfill body at different positions. This paper analyzed the immediate roof subsidence structure under two extreme conditions, constructed the roof segmented subsidence structure and the mechanical model of roadside backfill body, and used FLAC3D software to investigate the roof migration and the force law of the roadside backfill body under the conditions of different goaf backfilled rates, different width and strength of roadside backfill body. Finally, the backfill practice of a mine in Shandong Province of China is taken as an example for analysis. The results show that the segmented subsidence structure of the immediate roof is related to the mechanical properties of the roadside backfill body and the goaf backfill body. When the backfilled rate of goaf decreases from 95% to 70%, the width of roadside backfill body decreases from 5 m to 1 m, and the elastic modulus decreases from 10 GPa to 0.5 GPa, the greater difference in the subsidence and inclination of the immediate roof on both sides of the roadside backfill body is, the more obvious the segmented subsidence structure characteristics of the immediate roof are, and the greater force on the roadside backfill body will be, the more unfavorable it is to maintain the stability of the roadway surrounding rock and the roadway backfill body. Therefore, when gob side entry retaining is carried out in backfill mining, the surrounding rock structure and the force on roadside backfill body should be considered comprehensively.
机译:当在回填采矿中进行GOB侧进入保持时,由于回填体在不同位置的紧凑性和支撑力的差异,屋顶将显示不同的沉降形态。本文分析了两个极端条件下的立即屋顶沉降结构,构建了车顶分段沉降结构和路边回填机构的机械模型,并使用FLAC3D软件研究了路边回填机构在条件下的屋顶迁移和力量法不同的GOF回填率,路边回填机构的不同宽度和强度。最后,山东省矿井的回填实践是分析的例子。结果表明,立即屋顶的分段沉降结构与路边回填体的机械性能和GOAF回填体有关。当GOF的回填率从95%降至70%时,路边回填体的宽度从5米降低到1米,弹性模量从10GPa降低到0.5GPa,沉降和倾斜的差异越大。直接屋顶在路边回填机构的两侧是,即时屋顶的分段沉降结构特征越明显,并且路边回填体的较大力将是,更不利的是保持道路的稳定性围岩和巷道回填机构。因此,当在回填采矿中进行GOB侧进入保持时,应全面地考虑周围的岩石结构和路边回填体上的力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号