...
首页> 外文期刊>Energy economics >What is the value of the option to defer an investment in Transmission Expansion Planning? An estimation using Real Options
【24h】

What is the value of the option to defer an investment in Transmission Expansion Planning? An estimation using Real Options

机译:推迟对传输扩展计划进行投资的选项的价值是什么?使用实物期权的估算

获取原文
获取原文并翻译 | 示例
           

摘要

In deregulated markets, Transmission Expansion Planning (TEP) is usually performed by a central network planner seeking to maximize social welfare. In doing that, the network planner commonly follows a traditional project valuation, considering a discounted cash flow (DCF) methodology, although incorporating uncertainty and reliability considerations. Accordingly, once the optimal transmission expansion plan is determined, the network planner frequently auctions the needed investments, obligating the investor to execute the expansion in the fixed (inflexible) terms defined in the bidding process. A key problem is that DCF does not take into account the responses of the planner when uncertainties are resolved because DCF evaluates the project with the information available today. In TEP, managerial flexibility may be valuable because optimal decisions may change over time with the release of new information. Transmission investors may want to defer or expand according to such information. The aim of this article is to estimate the value of adding some flexibility in TEP through real options. In particular, by means of using a real-option approach with binomial trees, we study the benefits for a social network planner of having the option to defer some transmission investments. Our results suggest that incorporating flexibility in TEP may increase social welfare. (C) 2017 Elsevier B.V. All rights reserved.
机译:在放松管制的市场中,传输扩展计划(TEP)通常由寻求最大化社会福利的中央网络计划者执行。在这样做时,尽管考虑了不确定性和可靠性考虑因素,网络规划师通常会遵循传统的项目评估方法,同时考虑折现现金流(DCF)方法。因此,一旦确定了最佳的传输扩展计划,网络规划人员便会频繁拍卖所需的投资,从而使投资者有义务以投标过程中定义的固定(不灵活)条款执行扩展。一个关键问题是,当不确定性得到解决时,DCF不会考虑计划者的响应,因为DCF会利用当今可用的信息来评估项目。在TEP中,管理灵活性可能很有价值,因为随着新信息的发布,最佳决策可能会随着时间而变化。变速箱投资者可能希望根据此类信息进行延期或扩张。本文旨在评估通过实物期权在TEP中增加一些灵活性的价值。特别是,通过对二项式树使用实物期权方法,我们研究了社交网络计划者可以选择推迟一些传输投资的好处。我们的结果表明,在TEP中纳入灵活性可能会增加社会福利。 (C)2017 Elsevier B.V.保留所有权利。

著录项

  • 来源
    《Energy economics》 |2017年第6期|194-207|共14页
  • 作者单位

    Univ Norte, Dept Ind Engn, Kilometro 5, Barranquilla, Colombia;

    Pontificia Univ Catolica Chile, Dept Ind & Syst Engn, UC Energy Res Ctr, Av Vicuna Mackenna 4860, Santiago, Chile;

    Pontificia Univ Catolica Chile, Dept Ind & Syst Engn, UC Energy Res Ctr, Av Vicuna Mackenna 4860, Santiago, Chile;

    Univ Norte, Dept Ind Engn, Kilometro 5, Barranquilla, Colombia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Transmission Expansion Planning; Real options; Option to defer; Binomial tree; Flexibility;

    机译:传输扩展计划;实物期权;延期期权;二叉树;灵活性;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号