...
首页> 外文期刊>Energy Business Journal >Data on Structural Engineering Discussed by Y.J. Ge and Colleagues
【24h】

Data on Structural Engineering Discussed by Y.J. Ge and Colleagues

机译:葛耀杰及其同事讨论的结构工程数据

获取原文
获取原文并翻译 | 示例

摘要

2011 APR 27 - (VerticalNews.com) -- According to a study from Shanghai, People'srnRepublic of China, "Technical investigation of current bridging capacity of cable-supportedrnbridges shows that its single main span is up to 2 kilometres for suspension bridge and 1rnkilometre for cable-stayed bridge respectively with the total deck width of about 40 metres.rnApproaches to extend bridging capacity by utilising double main span suspension structure andrntwin parallel deck cable-stayed structure are introduced."
机译:2011年4月27日-(VerticalNews.com)-根据中国上海的一项研究,“对电缆支撑的桥梁的当前桥接能力进行的技术调查显示,悬索桥的主跨距最大为2公里,分别介绍了一种用于斜拉桥的桥架,其总甲板宽度约为40米。rn提出了利用双重主跨悬索结构和rntwin平行桥面斜拉桥结构来扩展桥梁承载能力的方法。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号