首页> 外文期刊>Energy and Buildings >Uncertain programming of building cooling heating and power (BCHP) system based on Monte-Carlo method
【24h】

Uncertain programming of building cooling heating and power (BCHP) system based on Monte-Carlo method

机译:基于蒙特卡洛方法的建筑物制冷供热(BCHP)系统的不确定编程

获取原文
获取原文并翻译 | 示例
       

摘要

Uncertainty of building energy demands has large influence on accuracy of building cooling heating and power (BCHP) programming model. Uncertain programming model is proposed to optimize BCHP system with consideration of uncertainty of energy demands. Monte-Carlo method (MCM) and mixed-integer nonlinear programming (M1NLP) are integrated in the model (M-M model for short). MCM can be used to simulate the uncertainty of energy demands avoiding dimension disaster and complex calculation. Correlation between different energy demands can also be considered in the model. And facility scheme and operation strategy can be optimized simultaneously in MINLP model. A numerical example is calculated with the M-M model. Convergence rate of expected values of the variables optimized in the model is high. Influence of energy demand uncertainty is studied with investigation of expected values, standard deviations of evaluation indicators and facility capacities. Sensitivity of the parameters to energy demand uncertainty is much different. It is unnecessary to consider uncertainty of energy demands when evaluating system feasibility with indicators of annual cost saving rate and annual natural gas saving rate, for they are influenced only a little by uncertainty of energy demands. While uncertainty of energy demands must be considered when studying parameters related to assistant facilities, which are very sensitive to the uncertainty. The result is valuable for designing strategy of facility scheme.
机译:建筑能源需求的不确定性对建筑制冷供热和功率(BCHP)编程模型的准确性有很大的影响。考虑到能源需求的不确定性,提出了不确定的规划模型来优化BCHP系统。该模型(简称M-M模型)集成了蒙特卡洛方法(MCM)和混合整数非线性规划(M1NLP)。 MCM可用于模拟能源需求的不确定性,避免尺寸灾难和复杂的计算。模型中也可以考虑不同能量需求之间的相关性。并且在MINLP模型中可以同时优化设施方案和运营策略。用M-M模型计算一个数值示例。在模型中优化的变量的期望值的收敛速度很高。通过研究期望值,评估指标的标准偏差和设施容量来研究能源需求不确定性的影响。参数对能源需求不确定性的敏感性有很大不同。在使用年度成本节约率和年度天然气节约率指标评估系统可行性时,无需考虑能源需求的不确定性,因为它们仅受能源需求不确定性的影响。虽然在研究与辅助设施相关的参数时必须考虑能源需求的不确定性,这些参数对不确定性非常敏感。结果对于设施方案的设计策略具有参考价值。

著录项

  • 来源
    《Energy and Buildings》 |2010年第9期|P.1369-1375|共7页
  • 作者单位

    Institute of Refrigeration and Cryogenics Engineering, Shanghai Jiaotong University, Shanghai 200240, China;

    Institute of Refrigeration and Cryogenics Engineering, Shanghai Jiaotong University, Shanghai 200240, China;

    Shanghai Architecture Science Institute, Shanghai, China;

    Shanghai Architecture Science Institute, Shanghai, China;

    Institute of Refrigeration and Cryogenics Engineering, Shanghai Jiaotong University, Shanghai 200240, China Shanghai Architecture Science Institute, Shanghai, China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    monte-carlo method; uncertainty model; energy demands; BCHP;

    机译:蒙特卡洛法不确定性模型能源需求;BCHP;
  • 入库时间 2022-08-18 00:10:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号