...
首页> 外文期刊>Energy and Buildings >A maximum power point tracking technique based on bypass diode mechanism for PV arrays under partial shading
【24h】

A maximum power point tracking technique based on bypass diode mechanism for PV arrays under partial shading

机译:基于旁路二极管机制的部分遮蔽下光伏阵列最大功率点跟踪技术

获取原文
获取原文并翻译 | 示例

摘要

During partial shading conditions, the power-voltage characteristics of photovoltaic (PV) array exhibit multiple local maxima (LMs), one of them is a global maximum (GM). Such conditions are very challenging for maximum power point tracking (MPPT) technique to locate the GM. In this paper, initially, the effects of partial shading on PV array are extensively studied with two comprehensive PV models. From this study, several critical observations regarding the working mechanism of bypass diodes (BD) are pointed out. These observations play a vital role in the designing of the proposed technique (BD-MPPT). The main characteristics of BD-MPPT are: (1) new voltage limit mechanism and (2) intelligent calibration of voltage steps. The proposed BD-MPPT shows better performance in comparison with the past-proposed MPPTs. To evaluate the performance, BD-MPPT is programmed in Matlab/Simulink. Simulations are carried out with several partial shading patterns which reveal that BD-MPPT always guarantees convergence to the GM. Furthermore, the proposed technique is tested using the experimental data of 86.24 kW building integrated PV plant. Data collected at different time intervals include different partial shading patterns. Results indicate that in most occasions, the efficiency of the building integrated PV plant reaches more than 96.6% with the aid of proposed BD-MPPT.
机译:在部分阴影条件下,光伏(PV)阵列的功率电压特性表现出多个局部最大值(LM),其中之一是全局最大值(GM)。对于最大功率点跟踪(MPPT)技术来定位GM而言,这样的条件非常具有挑战性。在本文中,首先,使用两个综合的PV模型广泛研究了部分遮光对PV阵列的影响。从这项研究中,指出了一些有关旁路二极管(BD)工作机制的重要观察。这些观察在所提出的技术(BD-MPPT)的设计中起着至关重要的作用。 BD-MPPT的主要特征是:(1)新的电压限制机制和(2)电压阶跃的智能校准。与过去提出的MPPT相比,提出的BD-MPPT具有更好的性能。为了评估性能,在Matlab / Simulink中对BD-MPPT进行了编程。用几种局部阴影模式进行了仿真,结果表明BD-MPPT总是保证与GM的收敛。此外,使用86.24 kW建筑物集成光伏电站的实验数据对提出的技术进行了测试。在不同时间间隔收集的数据包括不同的局部阴影模式。结果表明,在大多数情况下,借助拟议的BD-MPPT,建筑一体化光伏电站的效率可达到96.6%以上。

著录项

  • 来源
    《Energy and Buildings 》 |2014年第4期| 13-25| 共13页
  • 作者单位

    LIM - Mechatronics Laboratory, Politecnico di Torino, Italy,LIM - Mechatronics Lab, Department of Mechanical and Aerospace Engineering, Politecnico di Torino, Corso Duca degli Abruzzi, 24 - 10129 Torino, Italy;

    LIM - Mechatronics Laboratory, Politecnico di Torino, Italy,Department of Electronics and Telecommunication Engineering Politecnico di Torino, Italy;

    Department of Energy, Politecnico di Torino, Italy;

    LIM - Mechatronics Laboratory, Politecnico di Torino, Italy,Department of Mechanical and Aerospace Engineering, Politecnico di Torino, Italy;

    LIM - Mechatronics Laboratory, Politecnico di Torino, Italy,Department of Electronics and Telecommunication Engineering Politecnico di Torino, Italy;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Photovoltaic (PV); Maximum power point tracking (MPPT); Partial shading effects; Bypass diodes;

    机译:光伏(PV);最大功率点跟踪(MPPT);部分阴影效果;旁路二极管;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号