首页> 外文期刊>Energy analects >Major Power Infrastructure Proj Ects Moving Forward
【24h】

Major Power Infrastructure Proj Ects Moving Forward

机译:大型电力基础设施项目向前发展

获取原文
获取原文并翻译 | 示例
           

摘要

Two major Manitoba Hydro infrastructure projects - The Riel Reliability Improvement Initiative and the Wuskwatim hydroelectric development - are proceeding to various stages.rnThe Riel Sectionalization as it is also called is intended to provide an alternative connection of the existing high-voltage Dorsey-Forbes international transmission line connecting to southern Manitoba and eventually Minnesota in the United States.rnAlthough Dorsey station and the Dorsey-Forbes line are described by Manitoba Hydro as very important in exporting power to the U.S., they are also heavily relied upon to maintain import capability.rnAccording to Manitoba Hydro, sectionalization of the Dorsey-Forbes line and existing 230-kilovolt lines, which run along the Red River Floodway at the Riel site, will establish an alternative terminal station, which should provide for contingency of a broader range of upstream outages.
机译:曼尼托巴水电的两个主要基础设施项目-瑞尔可靠性改进计划和Wuskwatim水力发电开发-正在进行各个阶段。尽管曼尼托巴水电公司将多西站和多西-福布斯线描述为在向美国出口电力方面非常重要,但仍非常依赖它们来维持进口能力。 Manitoba Hydro,Dorsey-Forbes线和现有的230 kV线的分段,这些线沿着Riel站点的Red River Floodway行进,将建立一个替代性的终端站,这将为更广泛的上游停电事故提供应急条件。

著录项

  • 来源
    《Energy analects》 |2008年第25期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号