...
首页> 外文期刊>Energy analects >BC Hydro Gains Extension To File Connection Requests
【24h】

BC Hydro Gains Extension To File Connection Requests

机译:BC Hydro获得文件连接请求的扩展名

获取原文
获取原文并翻译 | 示例

摘要

BC Hydro and Power Authority has been granted relief from certain requirements in the British Columbia Transmission Corporation (BCTC) competitive electricity acquisition process (CEAP), which could have hampered theCleanPower Call (CPC).rnThe application filed to the British Columbia Utilities Commission (BCUC) requested relief from certain requirements in BCTC's CEAP process.rnHad BC Hydro not been granted relief, the it would have been required to submit by June 15 an application to BCTC for modification of network transmission services.
机译:卑诗省水电局已免除不列颠哥伦比亚输电公司(BCTC)竞争性电力采购流程(CEAP)的某些要求,这可能会阻碍CleanPower通话(CPC)。 )要求从BCTC的CEAP流程中的某些要求中减免。rn如果不授予BC Hydro,则必须在6月15日之前向BCTC提交一份修改网络传输服务的申请。

著录项

  • 来源
    《Energy analects 》 |2009年第12期| 7-7| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号