首页> 外文期刊>Electrical India >CPS Energy implements next generation integrated Distribution Management System from ABB
【24h】

CPS Energy implements next generation integrated Distribution Management System from ABB

机译:CPS Energy实施了ABB的下一代综合配电管理系统

获取原文
获取原文并翻译 | 示例
           

摘要

ABB - a leading power and automation technology company, has received an order for an Integrated Distribution SCADA system from CPS Energy of San Antonio, TX. Prior to this order, ABB has served as CPS Energy's primary contractor for implementing an integrated OMS/GIS system, complete with both electric and gas GIS and data conversion. The order expands the existing ABB Network Manager DMS installation at CPS Energy to include integrated ABB Network Manager SCADA for distribution. This project builds on CPS Energy's plans for an advanced distribution management platform (DMS) to support their utility of the future vision.
机译:领先的电力和自动化技术公司ABB已收到德克萨斯州圣安东尼奥市CPS Energy的集成配电SCADA系统订单。在此之前,ABB一直是CPS Energy的主要承包商,用于实施集成的OMS / GIS系统,包括电力和天然气GIS以及数据转换。该订单扩展了CPS Energy现有的ABB Network Manager DMS安装,包括集成的ABB Network Manager SCADA进行分发。该项目基于CPS Energy的高级配电管理平台(DMS)计划,以支持其对未来愿景的效用。

著录项

  • 来源
    《Electrical India》 |2008年第6期|p.44|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号