With capacity addition of Unit -1 of 660 MW of Stage-II of Tanda Super Thermal Power Station in Uttar Pradesh and Unit -1 of 660 MW of Khargone Super Thermal Power Station in Madhya Pradesh, the total installed capacity of NTPC and NTPC group has become 48645 MW and 57106 MW respectively.
展开▼