Some Time Ago, I represented a pharmaceutical company, which for years had employed an electrical contractor for maintenance and upgrades to its plant on a time-and-material basis. The owner then contracted for a new building to manufacture and package a dietary powder. The new building had an unusual configuration. Each of its 14 floors supported separate processes. As a result, each level had unique heights, some with mezzanines. The job was very difficult to estimate. There were a lot of rules on this construction project. No smoking was permitted in the building, or even on the owner's property. (A parking area for smokers was 200 yards away.) No food or drinks were permitted in the building, to maintain Food and Drug Administration (FDA) standards. Only one hoist was available, and that was used for material, or on an as-available basis, as a man-lift. Most of the time the workers had to use ladders to move from one level to another. Structural work ran behind schedule. By the time the interior electrical work was to begin, the project was six to eight weeks behind schedule. The original milestone schedule in the electrical contract had to be modified both in sequences and durations.
机译:我曾经在Time Ago担任一家制药公司的代表,该公司多年来一直聘用电力承包商来维护和升级其工厂的时间和材料。所有者随后与一家新建筑签约,以生产和包装膳食粉。新大楼的配置异常。它的14个楼层中的每个楼层都支持独立的流程。结果,每个级别都有独特的高度,其中一些带有夹层。这项工作很难估计。这个建设项目有很多规则。禁止在建筑物内甚至所有者的财产上吸烟。 (吸烟者的停车区在200码之外。)建筑物内不允许饮食,以保持食品药品监督管理局(FDA)的标准。仅有一个升降机可用,该升降机已用作物料或在可用的基础上用作人工升降机。大多数时候,工人不得不使用梯子从一个楼层移动到另一个楼层。结构工作落后于进度。到室内电气工作开始时,该项目比原计划晚了六到八周。电力合同中的原始里程碑时间表必须在顺序和持续时间上都进行修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号