首页> 外文期刊>Electric power systems research >Three utilization patterns of the renovated Moste hydro power plant on an electricity market of power and ancillary services
【24h】

Three utilization patterns of the renovated Moste hydro power plant on an electricity market of power and ancillary services

机译:电力和辅助服务电力市场上翻新的莫斯特水电站的三种利用方式

获取原文
获取原文并翻译 | 示例
           

摘要

In addition to electricity, most hydro power plants can offer also the ancillary services: secondary and tertiary control reserve. On emerging electricity markets the need for these additional services is becoming more and more important, recognised and also paid. However, for each plant, there is some interdependence among those options. The same plant cannot provide maximal peaking electricity, maximal secondary control reserve as well as maximal tertiary control reserve at the same time. The generation capabilities of the plant must thus be partitioned properly among those options so as to achieve some overall goal (e.g. the maximum of revenue, etc.). This article briefly presents those options for the renovated Moste cascade on the upper Sava river near Bled in Slovenia. A small but effective mixed integer linear programme has been used.
机译:除电力外,大多数水力发电厂还可以提供辅助服务:二级和三级控制储备。在新兴的电力市场上,对这些附加服务的需求变得越来越重要,得到认可并得到了满足。但是,对于每种植物,这些选择之间存在一定的相互依赖性。同一工厂不能同时提供最大峰值电,最大二次控制储备和最大三次控制储备。因此,工厂的发电能力必须在这些选项之间适当地划分,以实现某些总体目标(例如,最大收益等)。本文简要介绍了斯洛文尼亚布莱德附近萨瓦河上游的翻新过的莫斯特瀑布的那些选择。使用了一个很小但有效的混合整数线性程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号