首页> 外文OA文献 >Efficient bidding for hydro power plants in markets for energy and ancillary services
【2h】

Efficient bidding for hydro power plants in markets for energy and ancillary services

机译:对能源和辅助服务市场中的水力发电厂进行有效竞标

摘要

In order to preserve stability of electricity supply generators must provide ancillary services in addition to energy production. Hydroelectric resources have significant ancillary service capability because of their dynamic flexibility. This paper suggests a solution for optimal bidding for hydro units operating in simultaneous markets for energy and ancillary services by estimating water shadow price from operating parameters of the hydro unit, expectations on prices of energy and ancillary services, and water availability. The model implications are illustrated on a numerical example of a hydro unit operating in markets of New York Independent System Operator. Participation in ancillary services market increases or decreases water shadow price depending on water availability. As a result of participation in ancillary services markets, a unit with water availability given by a capacity factor of 0.6 increases the value of existing generating capacity by 25% and nearly doubles the value of incremental generating capacity.
机译:为了保持电力供应的稳定性,发电机除提供能源生产外还必须提供辅助服务。水力资源的动态灵活性具有重要的辅助服务能力。本文通过从水电单元的运行参数,对能源和辅助服务的价格的期望以及水的可利用性来估计水影子价格,为在能源和辅助服务的同时市场中运行的水电单元提供了一种最优投标的解决方案。在纽约独立系统运营商的市场中运行的水力机组的数值示例上说明了模型的含义。参与辅助服务市场会根据可用水量增加或减少水影价格。参与辅助服务市场的结果是,供水能力为0.6的单位将现有发电量的价值提高了25%,并使增量发电量的价值几乎翻了一番。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号