Optimal spares availability strategy for power transformer components

机译:电力变压器组件的最佳备件可用性策略

获取原文
获取原文并翻译 | 示例
           

摘要

The paper suggests a method to optimize the spare amount of power transformer components. The proposed strategy is conceived to provide minimum annual cost consisting of expected failures renewal cost, capital cost for spares and load curtailment cost. The method identifies minor and major failures. Minor failures are repairable, while major failures can be repairable or unrepairable. Power transformer is a complex system, consisting of six components (functional parts). It is assumed that each component has two independent, competing failure modes: wear-out failure mode, modelled by two-parameter Weibull distribution, and a chance failure mode, characterized by an exponential distribution. The application of the method suggested and the benefits it provides are demonstrated for one transformer station (TS) 110/xkV/kV with 2 × 31.5 MVA transformers. In addition, the influence of performing power transformer refurbishment on expected total cost has also been analyzed.
机译:本文提出了一种优化电力变压器组件备用量的方法。拟议的策略旨在提供最低的年度成本,包括预期的故障更新成本,备件资本成本和削减负荷成本。该方法识别次要和主要故障。轻微故障可以修复,而重大故障可以修复或无法修复。电力变压器是一个复杂的系统,由六个组件(功能部件)组成。假定每个组件都有两个独立的,竞争性的失效模式:用两参数威布尔分布建模的磨损失效模式和以指数分布为特征的偶然失效模式。所建议的方法的应用及其所带来的好处,在一个带有2×31.5 MVA变压器的变电站(TS)110 / xkV / kV上得到了证明。此外,还分析了进行电力变压器翻新对预期总成本的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号