首页> 外文期刊>Electric power systems research >An approximate methodology to verify the compliance of large photovoltaic power plants to system operator steady-state requirements
【24h】

An approximate methodology to verify the compliance of large photovoltaic power plants to system operator steady-state requirements

机译:一种验证大型光伏电站符合系统操作员稳态要求的近似方法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper proposes a methodology for the equivalent modeling of large photovoltaic power plants at the Point of Interconnection with the transmission/distribution network. The interest in such a methodology lays in the fact that recently Transmission/Distribution System Operators (TSOs/DSOs) have extended the requirements for the connection of renewable generation to their electricity networks beyond the only supply of active power, requiring ancillary services too. It is then a primary necessity for the Companies which operate in the market of large photovoltaic plants to have a simple but effective tool to verify the compliance of a proposed plant layout with specific TSO requirements (which vary from country to country) in order to support the bidding and preliminary design phase of the project.
机译:本文提出了一种与传输/分配网络互连的大型光伏电站的等效建模方法。对这种方法的兴趣在于,最近的输配电系统运营商(TSO / DSO)已将可再生能源发电与其电网的连接要求扩展到了唯一有功功率之外,这也需要辅助服务。因此,对于在大型光伏电站市场中运营的公司而言,拥有一个简单而有效的工具来验证拟议的工厂布局是否符合特定的TSO要求(因国家/地区而异)的主要必要条件就可以得到支持。项目的招标和初步设计阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号