首页> 外文期刊>Procedia Manufacturing >Behavior of photovoltaic systems connected to the distribution network. Case study, photovoltaic power plants in the distribution network of the SDEE Mure? operator
【24h】

Behavior of photovoltaic systems connected to the distribution network. Case study, photovoltaic power plants in the distribution network of the SDEE Mure? operator

机译:连接到配电网络的光伏系统的行为。案例研究,光伏电站中的SDEE配电网Mure?算子

获取原文
       

摘要

Today, the stability of the power distribution system is influenced by the significant number of photovoltaic power plants connected to the electric distribution network. This paper aims to present the results obtained after about three years of operation of a photovoltaic plant of (2.5-3,2) MW in terms of voltage variation in the common point of connection, power quality. Also, will present results of photovoltaic power plant certification, environmental factors that contributed to the production of electricity, responsiveness to change in the scheme of operation of the electricity distribution network. The case study refers to a single 2.8 MW photovoltaic plant, but it will review the operation of two more plants 2,8 MW located in different geographical areas, but with the same power, type of inverters and photovoltaic panels from one supplier. The data obtained will be teaching material when designing and simulating the operation of a new photovoltaic power plant.
机译:如今,配电系统的稳定性受到连接到配电网络的大量光伏电站的影响。本文旨在介绍(2.5-3,2)MW光伏电站运行大约三年后在公共连接点的电压变化,电能质量方面获得的结果。此外,还将介绍光伏电站认证的结果,对电力生产有贡献的环境因素,对配电网络运行方案变化的响应能力。案例研究涉及单个2.8 MW光伏电站,但它将审查另外两个位于不同地理区域但功率相同,逆变器类型和一家供应商的光伏电站类型相同的2,8 MW电站的运行情况。在设计和模拟新的光伏电站的运行时,获得的数据将作为教材。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号