首页> 外文期刊>Electric power systems research >Optimal Meter Placement in Low Observability Distribution Networks with DER
【24h】

Optimal Meter Placement in Low Observability Distribution Networks with DER

机译:使用Der的低可观察性分配网络中的最佳仪表放置

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a mixed integer linear programming (MILP) approach to deal with the volatility associated with loads and distributed energy resources (DER) in low observability distribution networks. Distribution networks, characterized by having many buses and few meters, have recently faced massive integration of DER, whose injection increases net load volatility. To better understand how to act under such increased volatility, the accuracy of state estimation (SE) needs to be improved. Our approach improves SE accuracy by providing meter placement solutions that take into account uncertainty as expressed by multiple load and DER profile scenarios, this way mitigating the impact of net load volatility. Solution results are illustrated and discussed for different case studies carried out over a radial 9 bus test feeder.
机译:本文介绍了一种混合整数线性编程(MILP)方法,以处理与低可观察性分配网络中的负载和分布式能源(DER)相关的波动率。分销网络,特征在于拥有许多公共汽车和少数米,最近面临的庞大集成DAR,其注射增加净负载波动性。为了更好地了解如何在这种增加的波动下采取行动,需要改善国家估计(SE)的准确性。我们的方法通过提供仪表放置解决方案来提高仪表放置解决方案,该解决方案考虑了由多重负载和DER配置文件场景表示的不确定性,这种方式减轻净负载波动率的影响。在径向9总线测试进料器上进行的不同案例研究说明并讨论了解决方案结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号