...
首页> 外文期刊>Electric power systems research >MW-mile recovery method in merchant transmission investment by generation companies
【24h】

MW-mile recovery method in merchant transmission investment by generation companies

机译:发电公司在商户输电投资中的兆英里回收方法

获取原文
获取原文并翻译 | 示例
           

摘要

Transmission expansion projects are seriously affected by the budget limitations. Stimulating private investment has been among the efficient ways to overcome this limitation. A structure is proposed to involve generation companies (GenCos) as private investors to invest in transmission expansion plans. The GenCo identifies the most appropriate plan among those announced by the Transmission Service Provider (TSP) through conducting a cost-benefit analysis. The cost-benefit function consists of the investment cost, the incremental expected profit from energy production, and the expected revenue from investment recovery. A transmission pricing mechanism is proposed to recoup the investment based on the MW-mile method. The delay in the construction time of generation and transmission projects is modeled by a scenario tree in the proposed cost-benefit analysis. The presented method is examined on the IEEE 24-bus system.
机译:传输扩展项目受到预算限制的严重影响。刺激私人投资一直是克服这一限制的有效方法。建议采用一种结构,让发电公司(GenCos)作为私人投资者来投资输电扩展计划。 GenCo通过进行成本效益分析,确定了传输服务提供商(TSP)宣布的最合适的计划。成本效益函数包括投资成本,能源生产的预期增量利润以及投资回收的预期收益。提出了一种基于MW-mile方法的输电定价机制来收回投资。在拟议的成本效益分析中,通过情景树来建模发电和输电项目的建设时间延迟。在IEEE 24-bus系统上检查了提出的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号