【24h】

Power Pack

机译:动力单元

获取原文
获取原文并翻译 | 示例
           

摘要

Since energy costs can represent a data center's single largest expense, companies are packing more servers and computer equipment into a single space in an effort to maximize power productivity. Eighty-two percent of data center construction costs are related to mechanical and electrical infrastructure, says Mike Manos, director of data center services at Microsoft Corporation. Microsoft recently built a new 500,000-square-foot data center outside Chicago that will average 400 watts per square foot.rnThe Microsoft facility will be one of the utility's largest consumers of electricity, says Alicia Zatkowski of Commonwealth Edison. In the past three or four years ComEd has added more than 10 new data center facilities, and an additional 5 centers are seeking locations within their territory. "Data centers are challenging for utilities to serve due to the amount of power they are seeking, which typically is not immediately available, and the speed with which the sector moves," says Zatkowski.
机译:由于能源成本可能代表数据中心的最大单笔支出,因此公司正在将更多服务器和计算机设备打包到一个空间中,以最大程度地提高电源生产率。微软公司数据中心服务总监迈克·马诺斯说,数据中心建设成本的百分之八十二与机械和电气基础设施有关。微软公司最近在芝加哥郊外建立了一个新的500,000平方英尺的数据中心,每平方英尺平均功率为400瓦。rn微软工厂将成为该公用事业公司最大的用电量之一,微软联邦爱迪生公司的Alicia Zatkowski说。在过去的三到四年中,ComEd已经增加了10多个新的数据中心设施,另外5个中心正在其领土内寻找位置。 Zatkowski表示:“由于数据中心正在寻求的电量(通常无法立即获得)以及该行业的发展速度,因此它们对公用事业的服务提出了挑战。”

著录项

  • 来源
    《Electric Perspectives》 |2009年第1期|16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号