首页> 外文期刊>Electric light & power >HTS drives the road to commercialization
【24h】

HTS drives the road to commercialization

机译:HTS推动了商业化之路

获取原文
获取原文并翻译 | 示例

摘要

Solutions to avoid reoccurring blackouts and energy shortages have typically focused on the need for generating more power. Ironically, with the increase in construction of new power plants over the last decade we now have a surplus of power, yet the energy shortages and blackouts persist. To effectively resolve this issue we need to finally recognize that the main cause of the problem is our inability to get energy where it needs to go. While we have enough generated capacity to meet our country's needs, we're lacking the proper infrastructure and technology to effectively distribute and transmit electricity to users. According to a recent FERC report, energy bottlenecks in the transmission system have cost consumers more than $1 billion in the past couple of summers, and the agency is supporting investments to improve the grid. The Commission believes that the resulting lower energy costs would pay for the cost of improving the transmission and distribution system within a few years. John Rowe, co-CEO of Exelon Corporation, testifying before the US Senate's Committee on Energy and Natural Resources said that maintaining the adequacy of our transmission grid at current levels would require a $56 billion investment during the present decade.
机译:避免再次出现停电和能源短缺的解决方案通常集中在产生更多电力的需求上。具有讽刺意味的是,在过去的十年中,随着新电厂建设的增加,我们现在拥有过剩的电力,但是能源短缺和停电依然存在。为了有效解决此问题,我们需要最终认识到问题的主要原因是我们无法在需要解决的地方获取能量。尽管我们有足够的发电能力来满足我们国家的需求,但我们缺少适当的基础设施和技术来有效地向用户分配和传输电力。根据FERC的最新报告,在过去的几个夏天,输电系统中的能源瓶颈使消费者损失了超过10亿美元,该机构还支持改善电网的投资。委员会认为,由此产生的较低的能源成本将在几年内支付改善输配电系统的成本。 Exelon Corporation联合首席执行官John Rowe在美国参议院能源与自然资源委员会作证时说,要保持我们输电电网的当前水平,在当前十年中将需要560亿美元的投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号