NO_x compliance and pending regulatory changes

机译:符合NO_x和即将发生的法规变更

获取原文
获取原文并翻译 | 示例

摘要

The U.S. electric power industry will continue to face major uncertainties in growth, deregulation, and environmental compliance challenges. The Energy Information Administration projects that as many as 1,300 new power plants, representing nearly 400 GW of capacity, will be needed by 2020 to meet demand and to off-set plant retirement. The industry not only must plan to meet increased electricity demand, but also must develop these plans during unprecedented industry restructuring and with major regulatory changes looming. Among these regulatory challenges, air quality management issues continue to be the most prominent. The U.S. Environmental Protection Agency (EPA) is expected to propose New Source Review (NSR) reforms in the near future and decide how it wants to address new facility construction and/or modifications to existing facilities under NSR. As EPA continues to work on NSR reform, the Department of Justice continues with its plans to prosecute suits against utilities for alleged violations of NSR rules. Overlying these regulatory initiatives, states continue to submit modifications to their state implementation plans (SIPs) in response to EPA's NO_x (nitrogen oxide) SIP Call.
机译:美国电力行业将继续在增长,放松管制和环境合规性挑战方面面临主要不确定因素。能源信息署(Energy Information Administration)预测,到2020年,将需要多达1300个新电厂,代表近400 GW的容量,以满足需求并抵消工厂退役。该行业不仅必须计划以满足不断增长的电力需求,而且还必须在前所未有的行业重组过程中以及迫在眉睫的重大监管变化中制定这些计划。在这些监管挑战中,空气质量管理问题仍然是最突出的问题。预期美国环境保护署(EPA)将在不久的将来提出新资源审查(NSR)改革,并决定如何解决新设施建设和/或NSR之下现有设施的改造。随着EPA继续致力于NSR改革,司法部继续执行其计划,对涉嫌违反NSR规则的公用事业提起诉讼。在这些监管举措的基础上,各州继续响应EPA的NO_x(氮氧化物)SIP征集对其状态实施计划(SIP)进行修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号