...
首页> 外文期刊>Electric light & power >Energy Efficiency All Grown Up
【24h】

Energy Efficiency All Grown Up

机译:能源效率日趋成熟

获取原文
获取原文并翻译 | 示例

摘要

Clean-coal investment has been stalled by significant uncertainty across all major aspects of the investment decision:rn1. Unclear timing of clean-coal technology commercialization,rn2. Economic dependence on market prices for energy commodities,rn3. Volatility in the relative economic position of IGCC andrnpulverized-coal plants compared with natural gas plants,rn4. Trade-offs between lower CCS costs and higher upfront capitalrnrequirements,rn5. Commercialization of existing coal-plant retrofits vs. new builds,rnandrn6. A significant number of CCS legal and regulatory hurdles thatrnmust be addressed before investors will become comfortablernfunding an asset that otherwise could become a large liability.
机译:清洁煤投资因投资决定的所有主要方面的重大不确定性而停滞不前:rn1。清洁煤技术商业化的时间不明确,rn2。经济对能源商品市场价格的依赖,rn3。 IGCC和粉煤电厂相对于天然气电厂的相对经济地位波动,rn4。较低的CCS成本与较高的前期资本需求之间的权衡,rn5。现有燃煤电厂改造与新建改造的商业化,rnandrn6。在投资者开始舒适地为一项资产筹集资金之前,必须解决大量的CCS法律和法规障碍,否则这些资产可能会变成一大笔债务。

著录项

  • 来源
    《Electric light & power》 |2009年第2期|3842|共2页
  • 作者

    Mark Gabriel;

  • 作者单位

    R.W. Beck Inc.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号