首页> 外文期刊>Electric Light and Power >Utilities Must Grapple With New FCC Pole Attachment Rules
【24h】

Utilities Must Grapple With New FCC Pole Attachment Rules

机译:公用事业必须努力应对新的FCC杆连接规则

获取原文
获取原文并翻译 | 示例
       

摘要

If a utility does not meet the deadline to complete a survey or make-ready for attachments in the communications space, a prospective attacher may hire a contractor approved by the utility to conduct the survey or complete the make-ready, including rearranging existing attachments on the pole.
机译:如果公用事业公司未在通信空间内完成调查或准备附件的截止日期,则准附件可以雇用该公用事业公司认可的承包商进行调查或完成附件的准备工作,包括重新布置现有附件。极点。

著录项

  • 来源
    《Electric Light and Power》 |2011年第3期|p.18-18|共1页
  • 作者单位

    by Shirley S. Fujimoto and Jeffrey L Sheldon , Fish & RichardsonAuthorsShirley S. Fujimoto and Jeffrey L. Sheldon are principals in Fish & Richardson's regulatory and government affairs group in Washington, D.C. They were counsel to the Edison Electric Institute in the FCC's pole attachment rulemaking. Reach them at fujimoto@fr.com and jsheldon@fr.com.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:15

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号