首页> 外文期刊>Electric light & power >Trees, Power Lines and NERC An Interview With NERC CEO Gerry Cauley
【24h】

Trees, Power Lines and NERC An Interview With NERC CEO Gerry Cauley

机译:树木,电线和NERC采访NERC首席执行官Gerry Cauley

获取原文
获取原文并翻译 | 示例
           

摘要

Cauley: Poor vegetation management was a key contributor in the August 2003 blackout in the Northeast. Three high-voltage lines in Ohio relayed out in the span of approximately an hour, acting as the trigger for a wide-area cascade of the system and the largest blackout in North American history. Improperly maintained right-of-way clearances create a situation where power system failures are not random, but systemic, such as we saw in Ohio in August 2003. It is essential that transmission line owners maintain safe clearances on their energized equipment. Not only do we have the issue of lines relaying out in a nonrandom fashion, we also assume that line ratings are valid based on the amount of sag caused by line heating. If the clearances are not sufficient, then the line ratings can become compromised and the reliability analysis we use to ensure the power system is in a safe state can become invalid.
机译:Cauley:不良的植被管理是2003年8月东北大停电的关键因素。俄亥俄州的三条高压线路在大约一个小时的时间内中继开来,触发了该系统的广域级联和北美历史上最大的停电。维护不当的通行许可会造成电力系统故障不是随机的而是系统性的情况,例如我们在2003年8月在俄亥俄州看到的情况。至关重要的是,输电线路所有者必须保持通电设备的安全许可。我们不仅会遇到线路以非随机方式中继的问题,而且还假定线路额定值基于由线路发热引起的下垂量是有效的。如果间隙不足,则线路额定值可能会受到影响,而我们用来确保电源系统处于安全状态的可靠性分析可能会失效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号