...
首页> 外文期刊>Electric light & power >Benefit of counsel: Standard Mark Design - Snake oil or a silver bullet?
【24h】

Benefit of counsel: Standard Mark Design - Snake oil or a silver bullet?

机译:顾问的好处:标准​​标记设计-蛇油还是银子弹?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Last month, we discussed the Federal Energy Regulatory Commission (FERC) staff's initial response to Enron's trading strategies. Another issue is how markets can be reformed to discourage those strategies which took advantage of flaws existing in the California power market. Appendix E to FERC's July 31, 2002 Notice of Proposed Rulemaking (NOPR) for its Standard Market Design (SMD) explains how SMD should accomplish that purpose. Many of Enron's trading strategies exploited flaws in the California power market, such as the fact that California's day ahead schedule was not financially binding and did not need to be physically feasible in real time. The California Power Exchange (PX) administered the day ahead market, while the real time balancing market was separately administered by the California Independent System Operator (ISO). There were discrete settlement systems for energy and congestion charges, and there was little information exchange between the PX and the ISO. These design flaws created incentives to initiate artificial congestion in the day ahead schedule and receive payment for illusory congestion relief in real time.
机译:上个月,我们讨论了联邦能源管理委员会(FERC)员工对安然交易策略的初步反应。另一个问题是如何改革市场,以阻止那些利用加利福尼亚电力市场中存在的缺陷的策略。 FERC在2002年7月31日发布的关于其标准市场设计(SMD)的拟议规则制定通知(NOPR)的附录E解释了SMD应该如何实现这一目的。安然公司的许多交易策略都利用了加利福尼亚电力市场的缺陷,例如,加利福尼亚州提前一天的时间表没有财务约束力,并且不需要实时实际可行。加利福尼亚电力交易所(PX)管理前一天的市场,而实时平衡市场则由加利福尼亚独立系统运营商(ISO)单独管理。能源和交通拥堵收费的分立结算系统,PX和ISO之间的信息交换很少。这些设计缺陷促使人们提前一天启动人为拥堵,并实时获得虚幻的拥堵救济。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号