首页> 外文期刊>Economic modelling >Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note
【24h】

Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note

机译:带有报废,返工和随机故障的EPQ模型的最佳运行时间:注意

获取原文
获取原文并翻译 | 示例
       

摘要

In a recent study [Chiu et al., 2007. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research 180, 664-676], the perfect rework of nonconforming items was assumed in a production system that is subject to stochastic breakdown and random defective rate. However, in most real-life manufacturing systems emphasizing on quality assurance, the perfect rework of nonconforming products may not always be possible as a result of various factors. Therefore, in order to enhance the practical usages of their research outcome, this paper incorporates failure in rework factor into Chiu et al.'s model, derives the optimal replenishment run time for the amended model, and investigates the effect of the failure in rework on the optimal operating policy through this exact model.
机译:在最近的一项研究中[Chiu等,2007。确定具有报废,返工和随机故障的EPQ模型的最佳运行时间。 [European Journal of Operational Research 180,664-676],在生产系统中假设不合格品的完美返工,该生产系统受随机故障和随机缺陷率的影响。但是,在大多数注重质量保证的现实生产系统中,由于各种因素的影响,不合格产品的完美返工可能并不总是可能的。因此,为了提高研究成果的实用性,本文将返工因子的失败纳入Chiu等人的模型,得出修正模型的最佳补货时间,并研究返工失败的影响通过此精确模型确定最佳运营策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号