首页> 外文期刊>EARSeL newsletter >Doppler wind lidar development at University of Oldenburg
【24h】

Doppler wind lidar development at University of Oldenburg

机译:奥尔登堡大学的多普勒测风激光雷达开发

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

For future multi-megawatt wind energy converters (WEC) in large-scale offshore wind farms new and advanced control strategies are required. Dynamic wind loads have to be reduced efficiently and with minimal controller operation, in order to deliver electricity to the grid in an optimized way. Up to now the implementation of these visions suffers from fundamental obstacles, despite the progress in many fields of wind energy technology. Large uncertainties due to the complex inflow within the rotor area influence the control and operation of wind energy converters. This problem becomes even more serious with growing rotor diameters beyond 120 m. Current control concepts can only react to wind field fluctuations which have already caused changes in rotational speed or loads.
机译:对于大型海上风电场中未来的兆瓦级风能转换器(WEC),需要新的高级控制策略。动态风载荷必须以最少的控制器操作有效地减少,以便以优化的方式将电力输送到电网。尽管在风能技术的许多领域都取得了进展,但到目前为止,这些愿景的实施仍存在根本障碍。由于转子区域内复杂的流入而产生的巨大不确定性会影响风能转换器的控制和运行。当转子直径超过120 m时,这个问题变得更加严重。当前的控制概念只能对已经引起转速或负载变化的风场波动做出反应。

著录项

  • 来源
    《EARSeL newsletter》 |2012年第89期|p.9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号