...
首页> 外文期刊>TV technology >Repack Deadline Passes-More Work Ahead
【24h】

Repack Deadline Passes-More Work Ahead

机译:重新打包截止日期通行证-未来还有更多工作要做

获取原文
获取原文并翻译 | 示例
           

摘要

The FCC's July 12 deadline for stations to file Schedule A, the engineering application for their post-repack facility, and Schedule 399, the request for reimbursement for that facility and other associated charges has passed.While I'm sure all of us breathed a sigh a relief when the last form was filed, there is a lot more work to do. Indeed, I suspect the rush to meet the deadline has produced applications for facilities that won't, or can't be built as filed and costs that are not fully documented. All this is going to have to be sorted out soon.
机译:美国联邦通信委员会(FCC)在7月12日前要求各站点提交附表A(其重新包装后设施的工程申请)和表399(该设施的报销要求及其他相关费用)的截止日期。提交最后一份表格时,请松一口气,还有很多工作要做。确实,我怀疑赶在最后期限之前急于提出无法或无法按照归档建造的设施的申请,以及尚未完全记录在案的费用。所有这些都必须尽快解决。

著录项

  • 来源
    《TV technology》 |2017年第8期|30-31|共2页
  • 作者

    DOUG LUNG;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号