首页> 外文期刊>Rekayasa >IBM KELOMPOK USAHA SOUVENIR SABLON DIGITAL
【24h】

IBM KELOMPOK USAHA SOUVENIR SABLON DIGITAL

机译:IBM Digital Screen Printing Souvenir Business Group

获取原文
       

摘要

Targets to be achieved through IbM is on aspects of production and management. Aspects of the production which increased the production technology of making souvenirs, increasing capacity in the field of design through the program Corel Draw and Adobe Photoshop as well as consolidation of production procedures with due regard to health and safety work management. Management aspects namely on financial management, financial management hold good with regular bookkeeping, through marketing management produces forms of promotion through various media. Market network expansion and facilitate consumer access to order products.Through HR management can improve the training of human resources, the provision of entrepreneurial motivation and self empowerment. IbM implemented through phases 1 ) Preparation ; 2 ) Stage Assessment ; 3 ) The Plan or Program Activity; 4 ) Phase Action Plan ; 5 ) Implementation Phase or activity ; and 6 ) Evaluation Phase . It is expected to be implemented through the stages can help solve problems and realize the needs of partners.
机译:通过IBM实现的目标是生产和管理方面。生产纪念品的生产技术的发展方面,通过计划Corel Draw和Adobe Photoshop以及适当考虑到健康和安全工作管理的生产程序巩固生产过程中的能力。管理方面即财务管理,财务管理良好的定期簿记,通过营销管理通过各种媒体产生促销形式。市场网络扩展和促进消费者获得订单产品.Through管理层可以改善人力资源的培训,提供企业家动机和自我赋权。 IBM通过阶段实施)制备; 2)阶段评估; 3)计划或计划活动; 4)阶段行动计划; 5)实施阶段或活动;和6)评估阶段。预计将通过阶段实施,可以帮助解决问题并实现合作伙伴的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号