首页> 外文期刊>International Journal of Traffic and Transportation Engineering >Estimation of Pavement Damage Costs Attributed to Overloaded Heavy Goods Vehicles on Nigerian Highways
【24h】

Estimation of Pavement Damage Costs Attributed to Overloaded Heavy Goods Vehicles on Nigerian Highways

机译:估计尼日利亚高速公路超载重型货车的路面损伤成本

获取原文
       

摘要

The paper assessed road pavement damage caused by heavy goods vehicles and their associated costs. The paper adopted pavement damage estimation technique that combined the HERS and the AASHTO. The highway sections of Lokoja-Abuja, Ilorin-Jebba and Abakiliki-Ogoja via Mbok roads were selected and data were collected through an axle-load survey, automatic traffic count and from secondary sources. The Metrocount Executive software and Excel Ad-ons were used in analyzing the data. The damaging effects of the HGV are more severe at Lokoja-Abuja Road (with g = 0.30), followed by Ilorin-Jebba Road (with g = 0.35) and Abakiliki-Ogoja Road (with g = 0.43). The heaviest overload of 94% of the 6-axle vehicles from cement carrying trucks plying the Lokoja-Abuja road could explain this intense damaging effect on the road pavement. Upon aggregation, the benchmark average annual maintenance costs per kilometre in Nigeria stands at ?143,182,853.55, while the average annual per-km maintenance costs attributed to Heavy Goods Vehicle traffic is ?101,385,881.57. Thus, the unit damage cost per ESAL-km was computed as ?5.65, ?5.70 and ?0.74 for Lokoja-Abuja, Ilorin-Jebba, and Abakiliki-Ogoja roads respectively. Hence, the benchmark per- equivalent single axle loads unit cost for the Nigerian roads is ?4.03. This figure represents the benchmark damaging cost of overload per equivalent single axle loads (ESAL) on the Nigerian road. This becomes a basis for control of excessive axle-load violations on the Nigerian roads.
机译:本文评估了重型货车造成的道路路面损坏及其相关成本。纸张采用了人行道损伤估算技术,将HERS和AASHTO组合。选择了Lokoja-Abuja,Ilorin-Jebba和Abakiliki-Ogoja的高速公路部分,通过MBOK公路进行了选择,通过轴负荷调查,自动流量计数和二级来源收集数据。 MetroCount执行软件和Excel Ad-On用于分析数据。 HGV的破坏性效果在Lokoja-Abuja路(G = 0.30)更严重,其次是Ilorin-Jebba路(G = 0.35)和Abakiliki-Ogoja路(G = 0.43)。来自Lokoja-Abuja Road的水泥运载卡车的6轴车辆的最重94%的最重94%可以解释在路面上的这种强烈损坏。在聚合时,尼日利亚每公里的基准平均年度维护成本在?143,182,853.55,而归因于重型货车交通的年平均每公里维护成本是?101,385,881.57。因此,每个ESAR-KM的单位损坏成本是多少?5.65,?5.70和?0.74分别用于Lokoja-Abuja,Ilorin-Jebba和Abakiliki-Ogoja路。因此,尼日利亚道路的基准相等的单轴负载单元成本是?4.03。该图表示尼日利亚路上的每价单轴负荷(ESAL)过载的基准损坏成本。这成为控制尼日利亚道路上过度轴承船舶侵犯的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号