首页> 外文期刊>Procedia CIRP >Task Scheduling for Tier-to-tier Four-way Shuttle Warehousing System
【24h】

Task Scheduling for Tier-to-tier Four-way Shuttle Warehousing System

机译:Tier-tie-tier四路班车仓储系统的任务调度

获取原文
       

摘要

In tier-to-tier four-way shuttle warehousing system (TFSWS), the idle of shuttles or lifts caused by unreasonable task assignment affects the system’s efficiency. To solve this problem, a task scheduling model is established, in which the job is abstracted into the coding of the task sequence and the third allocation of system resources. Then, an improved genetic algorithm (IGA) is proposed to solve the model. Finally, a practical case is adopted to validate the usability of the established model and the superiority of the proposed method.
机译:在Tier-tiper-Tier四路班车仓储系统(TFSW)中,由不合理的任务分配引起的梭子或升降机的空闲影响系统的效率。 为了解决这个问题,建立了一个任务调度模型,其中作业被抽象到任务序列的编码和系统资源的第三分配中。 然后,提出了一种改进的遗传算法(IGA)来解决模型。 最后,采用了实际案例来验证建立模型的可用性和所提出的方法的优越性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号