首页> 外文期刊>E3S Web of Conferences >A model for setting up development programs for logistics systems in the electric power industry to achieve electric power security
【24h】

A model for setting up development programs for logistics systems in the electric power industry to achieve electric power security

机译:建立电力行业物流系统开发计划实现电力安全的模型

获取原文
           

摘要

The electric power security of the Russian Federation is one of the most important factors influencing the economy and social sphere, as well as the living conditions and activities of Russian citizens. Thus, one of the global issues concerning electric power security is to keep a balance between the demand for resources and the lack of ability of the corresponding logistic systems to provide continuity and synchronize the processes of production, distribution and delivery of enough electric power to consumers. The urgent need for purposeful development of logistics systems in the electric power industry and to ensure electric power security determines the relevance of improving the methodological tools for taking rational decisions in planning and managing this process. This paper is aimed at improving these tools. It proposes a generalized structure of the model and an algorithm for solving the problem related to forming the best variant of the logistics system development program in the electric power industry. The minimization of financial costs is used as a criterion of optimality in the model. To take into account the uncertainty inherent in the development of the logistics system in the electric power industry, the it is necessary to set the intervals of the possible costs of the project components. To resolve this problem an iterative algorithm is proposed so that an expedient variant of the project is formed consistently.
机译:俄罗斯联邦的电力安全是影响经济和社会领域的最重要因素之一,以及俄罗斯公民的生活条件和活动。因此,有关电力安全的全球问题之一是在对资源需求和相应的物流系统提供连续性的情况下保持平衡,并使生产,分配和向消费者提供足够的电力的生产过程,分配和向消费者同步。迫切需要在电力行业中有目的地开发物流系统的目的,并确保电力安全决定改善在规划和管理此过程中采取合理决策的方法工具的相关性。本文旨在改进这些工具。它提出了一种模型的广义结构和一种解决与在电力行业中形成物流系统开发计划的最佳变体相关的问题的算法。最小化财务成本被用作模型中最优性的标准。要考虑到电力行业后勤系统开发中固有的不确定性,必须设定项目组件可能成本的间隔。为了解决这个问题,提出了一种迭代算法,使得始终形成项目的权宜变变量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号