首页> 外文期刊>E3S Web of Conferences >Spring diagrams for the visualization of construction project dynamics
【24h】

Spring diagrams for the visualization of construction project dynamics

机译:用于施工项目动态的可视化的春天图

获取原文
获取外文期刊封面目录资料

摘要

Construction projects are very dynamic, so change management is crucial there. Changes in schedule and in stakeholders relationships are among the most important change management areas. Making decisions on such changes is an extremely difficult task. It can be facilitated by special visualization techniques. The existing techniques are analyzed and their drawbacks revealed. In order to address these drawbacks, new techniques are proposed for the visualization of both schedule and stakeholders relationships changes. They are based on the application of the spring image used in mechanics to the visualization of the project’s dynamics. The performance of the techniques is shown in examples. The results are discussed and further research is outlined.
机译:建设项目非常动态,因此变革管理在那里至关重要。 计划和利益相关者关系的变化是最重要的变革管理领域。 对这种变化做出决定是一项非常艰巨的任务。 它可以通过特殊的可视化技术促进。 分析了现有的技术,并揭示了它们的缺点。 为了解决这些缺点,提出了对既比度的可视化和利益相关者关系的新技术。 它们基于机械师使用的春天图像的应用来实现项目动态的可视化。 该技术的性能如实施例所示。 结果讨论并概述了进一步的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号