PERT and CPM in Project Management with Practical Examples

机译:具有实际示例的项目管理中的Pert和CPM

获取原文
   

获取外文期刊封面封底 >>

       

摘要

This paper reviewed the concepts of Project Evaluation Review Technique and Critical Path Method in project management with practical examples. The methods and success of quantitative decision-making approaches in project management through t he use of project evaluation review technique and the critical path method as regards project duration and critical activities of a project, were discussed. The review found that while both methods are effective in achieving success in project management, the relationship and connectivity of activities involved in a project life cycle are key aspects. The paper concludes that the project evaluation review technique is more effective when the duration of the project is uncertain, while the critical path method is effective when the project’s end time is certain. The paper, therefore, recommends that to achieve maximum operative efficiency in utilizing resources in project management, p rior to commencing the execution of a project, all required resources to cover every activity must be assembled and prioritized to eliminate interruptions that could bring delay and unnecessary cost implications. Again, policies focused on improving project execution should be implemented in developing nations to minimize the many cases of failed and delayed projects. Subsequently, stakeholders in projects must be given the right, under the law, to prosecute the government, its agencies and/or the executors of projects for failure to execute a project on schedule.
机译:本文综述了实际例子项目管理项目评估审查技术和关键路径方法的概念。讨论了通过与项目评估审查技术的使用项目管理项目管理中的定量决策方法的方法和成功及其在项目的项目持续时间和项目的关键活动中进行了讨论。审查发现,虽然两种方法都有效地实现了项目管理成功,但项目生命周期中涉及的活动的关系和连通性是关键方面。本文的结论是,当项目的持续时间不确定时,项目评估审查技术更有效,而关键路径方法在项目的结束时间确定时是有效的。因此,本文建议在利用项目管理中利用资源的最大操作效率,P rior开始执行项目,所有必需的资源都必须组装并优先考虑消除可能带来延迟和不必要的中断成本影响。同样,重点关注改善项目执行的政策应在发展中国家实施,以尽量减少失败和延迟项目的许多情况。随后,必须在法律下赋予项目的利益攸关方,以便起诉政府,其机构和/或项目的执行者未能按计划执行项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号