首页> 外文期刊>Mathematical Problems in Engineering: Theory, Methods and Applications >Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming
【24h】

Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming

机译:通过嵌套坑生成和动态规划露天煤矿的阶段规划

获取原文
           

摘要

This paper presents a phase planning method specially designed for coal deposits with nearly horizontal, bedded coal seams. The geology of this type of deposit is modeled into a column model, instead of a block model, to avoid coal-rock mixing in blocks. A nested pit generation algorithm is developed for producing a series of nested, least-strip ratio pits with a column model as its input. The algorithm completely overcomes the troublesome gap problem. Taking the least-strip ratio pits as possible phase states, a dynamic programming formulation is proposed to simultaneously optimize the number of phases, the phase-pits, and the ultimate pit, with an objective of maximizing the net present value. The merits and capability of the proposed method are demonstrated through a case study on a large coal deposit.
机译:本文介绍了一种专门为煤矿煤层设计的相位规划方法,具有几乎水平,煤层煤层。 这种沉积物的地质学模拟成柱模型,而不是块模型,以避免在块中燃煤混合。 开发了一种嵌套坑生成算法,用于产生一系列嵌套,最小条带比率,具有列模型作为其输入。 该算法完全克服了麻烦的差距问题。 考虑到最小条带比率凹坑作为可能的相位状态,提出了一种动态编程制剂,同时优化相位,相位凹坑和最终坑的数量,其目的是最大化净现值。 通过对大型煤矿沉积物的案例研究证明了该方法的优点和能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号