首页> 外文期刊>MATEC Web of Conferences >Study for the Pile Foundation on Steep Slope Applied in UHV Transmission projects
【24h】

Study for the Pile Foundation on Steep Slope Applied in UHV Transmission projects

机译:UHV传输项目陡坡桩基桩研究

获取原文
获取外文期刊封面目录资料

摘要

When designing a pile on the steep slope, the calculation is based on a hypothesis of horizontal ground. Obviously, it is difficult to estimate the difference between the calculation result and the actual loading behaviour of the pile foundation. For a UHV (Ultra High Voltage) power transmission project in China, results are compared by two kinds of methods. One is traditional theory; the other is numerical simulation method. It shows that quite different deformation of ground foundation occurs near two sides of the pile cap. The traditional calculating method for the pile foundation can consider the effect by increasing the part of the pile above the ground surface. Reasonability of the increased value can be assessed by the numerical method. The result of numerical simulation shows that the maximum deformation appears in the middle of the pile, but it occurs in the top of the pile by the traditional method. And deformation is evidently larger by the traditional method. Deformation curve is different between the traditional method and the numerical method which can consider frictional resistance around the pile. Quite different are vertical stress values of the pile obtained by two methods.
机译:在陡坡上设计桩时,计算基于水平地的假设。显然,很难估计桩基的计算结果与实际装载行为之间的差异。对于中国的UHV(超高电压)电力传输项目,结果采用两种方法进行了比较。一个是传统理论;另一个是数值模拟方法。它表明,桩帽的两侧发生了完全不同的地基变形。桩基的传统计算方法可以通过增加地面上方的桩的一部分来考虑效果。可以通过数值方法评估增加值的合理性。数值模拟的结果表明,最大变形出现在桩的中间,但它通过传统方法发生在桩的顶部。通过传统方法显然更大,变形是显然的。变形曲线在传统方法和数值方法之间是不同的,这可以考虑桩周围的摩擦阻力。完全不同的是通过两种方法获得的桩的垂直应力值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号