Ranking of Delay Factors for Makkah’s Construction Industry

机译:Makkah建筑业延迟因素排名

获取原文

摘要

This paper presents identification of significant delay factors encountered by Makkah’s construction industry using quantitative approach. A structured questionnaire developed based on literature review was verified through pilot study involved selected construction experts. Questionnaire survey was conducted amongst Makkah construction practitioners include contractors, consultants and project management consultancy. The survey managed to collect 100 valid responses which were used to rank the factors using average index approach. Results of the analysis for 10 most significant factors causing construction delay in Makkah construction industry are Difficulties in financing project by contractor, Poor coordination between parties, Shortage of manpower, Delays in producing design documents, Improper planning and scheduling of the project, Delay in progress payments, Low productivity level of labour, Poor communication between parties, Unqualified workforce and Poor contract management. This finding is helpful to Makkah construction’s community particularly projects’ stakeholders in avoiding potential delay for their future projects.
机译:本文展示了使用定量方法的Makkah建筑业遇到的显着延误因素。通过涉及所选建筑专家的试点研究验证了基于文献综述开发的结构化问卷。 ConseNnaire调查是在Makah建筑从业者中进行的,包括承包商,顾问和项目管理咨询公司。该调查设法收集100个有效的响应,用于使用平均指数方法对因素进行排名。 10个造成施工延误的10个最重要因素的分析结果造成承包商融资项目的困难,缔约方之间的协调不足,人力短缺,制定设计文件的延迟,项目不当规划和计划,延迟进展付款,劳动力低的生产率水平,缔约方之间差,不合格的劳动力和合同管理差。这一发现对Makkah建设的社区特别有利于项目的利益相关者来避免潜在的未来项目延迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号