Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach

机译:利用PLS-SEM路径建模方法的沙特阿拉伯建筑业延误因素

获取原文
           

摘要

This paper presents the development of PLS-SEM Path Model of delay factors of Saudi Arabia construction industry focussing on Mecca City. The model was developed and assessed using SmartPLS v3.0 software and it consists of 37 factors/manifests in 7 groups/independent variables and one dependent variable which is delay of the construction projects. The model was rigorously assessed at measurement and structural components and the outcomes found that the model has achieved the required threshold values. At structural level of the model, among the seven groups, the client and consultant group has the highest impact on construction delay with path coefficient β-value of 0.452 and the project management and contract administration group is having the least impact to the construction delay with β-value of 0.016. The overall model has moderate explaining power ability with R2 value of 0.197 for Saudi Arabia construction industry representation. This model will able to assist practitioners in Mecca city to pay more attention in risk analysis for potential construction delay.
机译:本文介绍了在麦加城重点关注沙特阿拉伯建筑业延迟因素的PLS-SEM路径模型。使用SmartPLS V3.0软件开发和评估该模型,它由7组/独立变量的37个因素/表现形式,以及一个延迟建设项目的依赖变量。在测量和结构部件处严格评估该模型,结果发现该模型已经实现了所需的阈值。在模型的结构层面,在七组中,客户和顾问组对施工延迟的影响最高,路径系数β - 值为0.452,项目管理和合同管理组对建设延误的影响最小β值为0.016。总体模型具有中等解释的功率能力,为沙特阿拉伯建设行业代表具有0.197的r2值。该模型将能够帮助麦加市的从业者在潜在建设延迟的风险分析中获得更多关注。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号