首页> 外文期刊>E3S Web of Conferences >Design and Construction of the Circular Shape Shaft Using the Reverse Construction Method
【24h】

Design and Construction of the Circular Shape Shaft Using the Reverse Construction Method

机译:逆向施工法的圆形轴设计与构造

获取原文
           

摘要

Restricted by the environment and the city’s planning, some pipe jacking used for the HV cable tunnel have to pass through some roads which has been build. Different kind of equipment has certain applicability in the pipe jacking construction procedure, especially with the geological condition, and encountering in the boulder is a common problem in the residual soil or in the strong weathered rock stratum, in this situation, a vertical shaft is needed to remove the boulder. In order to save the site area, a new shaft which is in circular shape is designed, and this paper introduces the main procedure of how to design and construct the new circular shaft. In a Fuzhou HV cable tunnel, the new shape shaft clears away the stone in the clay successfully, and reduces the impact on the ground traffic, the design and construction procedure of the new shaft have been analyzed in this paper, which provides reference for similar construction.
机译:受环境的限制和城市的规划,用于HV电缆隧道的一些管道必须通过一些已经构建的道路。不同种类的设备在管道上的施工过程中具有一定的适用性,特别是在地质状态下,在巨石中遇到的是残留的土壤中的常见问题,在这种情况下,需要垂直轴去除巨石。为了保存位点区域,设计了一种处于圆形的新轴,本文介绍了如何设计和构造新圆轴的主要过程。在福州高速电缆隧道中,新形状轴成功地拆开了粘土中的石头,并减少了对地面交通的影响,本文分析了新轴的设计和施工过程,为类似的参考提供了参考建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号