...
首页> 外文期刊>E3S Web of Conferences >Supply of additional working fluid to the flow part of the NK-8 gas turbine engine
【24h】

Supply of additional working fluid to the flow part of the NK-8 gas turbine engine

机译:向NK-8燃气轮机发动机的流动部分供应额外的工作流体

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Modern energy development strategies of advanced countries are based on the construction of gas turbine units which is associated with sufficiently high values of thermal efficiency and a relatively short term for putting them into operation. In this paper, the NK-8 engine is considered. It is modernized with a mixing chamber and a power turbine for the purpose of its ground application. A study was conducted of the injection of an additional working fluid into the flow part of a dual-circuit gas turbine engine. Steam is used as an injectable substance. For research a mathematical model was created in the AS ?GRET? software package. The studies were carried out under constant load, the maximum load during injection was determined. An additional worker can be supplied with summer power limitations when it is necessary to increase the power of a gas turbine installation. Studies have shown that the maximum power that can be obtained by supplying steam to the flow part is 32.2 MW.
机译:先进国家的现代能源开发策略基于燃气轮机单元的建造,该机组与热效率的充分高的值相关,以及相对短的术语,使其进入运行。在本文中,考虑了NK-8发动机。它与混合室和动力涡轮机的现实化以其地面应用的目的。将额外的工作流体注入双电路燃气涡轮发动机的流动部分进行研究。蒸汽用作可注射物质。对于研究,一个数学模型是在are?gret中创建的?软件包。在恒定载荷下进行研究,测定注射期间的最大载荷。当有必要增加燃气轮机安装的功率时,可以提供额外的工人。研究表明,通过向流动部分供应蒸汽来获得的最大功率是32.2兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号