首页> 外文期刊>The Open Civil Engineering Journal >Assessment of the Current State of Internal Force and the Optimization of Cable Force for an Existing Long-span Pre-Stressed Concrete (PC) Cable-stayed Bridge
【24h】

Assessment of the Current State of Internal Force and the Optimization of Cable Force for an Existing Long-span Pre-Stressed Concrete (PC) Cable-stayed Bridge

机译:对现有长跨度预应力混凝土(PC)斜拉桥现有的内力当前内部力状态的评估及电缆力的优化

获取原文
       

摘要

Introduction:Due to the influence of load, fatigue, corrosion, natural material aging and other long-term adverse factors, the state of the internal force of a cable-stayed bridge will be changed. These long-term effects can result in the bridge not meeting specified functional requirements, and potentially resulting in structural failure. This investigation focuses on the parameter identification of a girder for a pre-stressed concrete (PC) cable-stayed bridge. Without considering the influence of cable relaxation and temperature on the girder’s geometric shape, an improved method based on the “cable force-girder’s displacement” relationship is proposed.
机译:介绍:由于负荷,疲劳,腐蚀,天然材料老化等的影响和其他长期不利因素,将改变电缆储存桥的内部力的状态。这些长期效应可能导致桥梁不符合规定的功能要求,并且可能导致结构性失败。本研究侧重于预应力混凝土(PC)斜桥的梁的参数识别。不考虑电缆松弛和温度对梁几何形状的影响,提出了一种基于“电缆力 - 梁位移”关系的改进方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号