Research on a Method About Determining the Initial State of the Internal Force in Existing Cable-Stayed Bridge

机译:确定既有斜拉桥内力初始状态的方法研究

获取原文
获取原文并翻译 | 示例
       

摘要

Cable tension adjustments carried out on the existing cable-stayed bridge means optimal adjustments of the internal force. It differed from optimization in the design phase or the construction process, because the existing cable-stayed bridge' construction process is uncertain and it's structural parameters of materials is degenerating. In this article, it supposes that uncertain construction process, mutative structural parameters and the corresponding displacement of bridge structure caused by external loads are due to the change in cable tension. Based on the data of static testing, it certificates the corresponding relationship of changes in cable tension and displacement; submits the parameter identification method according to cable force-displacement' relationship to determine the initial state of the internal forces in existing cable-stayed bridge. This method was used in adjusting and changing cables reinforcement project of a cable-stayed bridge which has operated for many years.
机译:在现有斜拉桥上进行的缆索张力调整意味着可以对内力进行最佳调整。它与设计阶段或施工过程的优化不同,因为现有的斜拉桥的施工过程不确定,并且材料的结构参数正在退化。在本文中,假定不确定的施工过程,变化的结构参数以及由外部荷载引起的桥梁结构的相应位移是由于电缆张力的变化引起的。根据静态测试数据,证明电缆张力和位移变化的对应关系;根据索力-位移关系,提出参数识别方法,确定既有斜拉桥内力的初始状态。该方法用于已运营多年的斜拉桥的电缆加固工程的调整和更换。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号