首页> 外文期刊>Quarterly reports of RTRI >Applicability of Magnitude Determination Method Considering Time Dependence of P-Wave Growth to Railway Earthquake Early Warning System
【24h】

Applicability of Magnitude Determination Method Considering Time Dependence of P-Wave Growth to Railway Earthquake Early Warning System

机译:考虑时间依赖性对铁路地震预警系统的时间依赖性的幅度测定方法的适用性

获取原文
           

摘要

This article examines an earthquake magnitude (M) determination method to test its applicability for the railway earthquake early warning system. Although the effectiveness of the M determination method has been shown so far when multiple station approach is used, the railway system employs a single station algorithm considering immediacy of the warning. This study investigates if the M determination method can improve the performance of the system analyzing seismic records observed in Japan. As a result, the test demonstrated that the method speeds up the final M estimation without loss of accuracy, suggesting that the risks of running trains during an earthquake can be reduced by applying the new technique to the railway system.
机译:本文介绍了地震幅度(M)测定方法,以测试其对铁路地震预警系统的适用性。尽管在使用多站方法的情况下已经示出了M确定方法的有效性,但是铁路系统采用考虑警告的即时性的单站算法。本研究调查了M确定方法可以提高分析日本观察到的地震记录的系统的性能。结果,该测试证明了该方法速度升高了最终的M估计而不会损失精度,表明通过将新技术应用于铁路系统,可以减少在地震期间运行列车的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号