首页> 外文期刊>UIR Law Review >Penyelesaian Sengketa Wanprestasi Akibat Keterlambatan Pelaksanaan Perjanjian Kontsruksi Bangunan
【24h】

Penyelesaian Sengketa Wanprestasi Akibat Keterlambatan Pelaksanaan Perjanjian Kontsruksi Bangunan

机译:由于建筑争议协议执行延迟,解决违约纠纷

获取原文
       

摘要

Development is an effort to create prosperity and welfare for the people. A development work cannot be separated from the construction contract. In its implementation, In its implementation, many construction service providers, both service users and contractors, did not carry out their achievements as specified in the contract. The Building Construction Contracts on the construction of the Grhatama Pustaka Library Building in the Special Region of Yogyakarta is considered as a default. The purpose of this study is to determine the dispute resolution for delays in the achievement of performance on the implementation of the Building Construction Contracts based on Decision Number: 87/Pdt.G/2013/PN.Bantul. This study uses a normative juridical approach using legislation and jurisprudence (court decisions). The results showed that dispute resolution for delays in fulfilling litigation performance through the Bantul District Court with Results of Decisions obliged service providers to submit building construction work to service users in a proper and good condition and were obliged to pay compensation and interest to service users.
机译:发展是为人民创造繁荣和福利的努力。发展工作不能与施工合同分开。在其实施中,在其实施中,许多施工服务提供商,服务用户和承包商都没有按照合同中规定的成就。建筑施工合同在日惹特殊地区建设Grhatama Pustaka图书馆建筑被认为是默认的。本研究的目的是根据决定编号确定延迟延误延迟争议,以便根据决定编号:87 / PDT.G / 2013 / PN.Bantul。本研究采用了法定和法学(法院决定)的规范性法律方法。结果表明,延误通过Bantul地区法院履行诉讼表现的争议解决方案,决定义务服务提供商以适当且良好的状况提交建设施工工作,并有义务为服务用户支付赔偿和利息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号